Site Works Start for Four Planned Kola II Reactors in Russia
Site preparation has started for the Kola II nuclear power units in Russia, following the granting of a site licence by Russian regulator Rostekhnadzor, according to World Nuclear News.
Rosatom intends to build four units at the site using the VVER-S design, a 600 MWe water-cooled reactor still under development, with the first two scheduled for construction between 2027 and 2037.
The fuel cycle is central to the design case. Rosatom says that if the proposed VVER-S reactors can run on a full load of mixed oxide (MOX) fuel, natural uranium use would fall by 50%.
The new capacity is meant to replace the four VVER-440 units already operating at Kola, each rated at 411 MWe and connected to the grid between 1973 and 1984, World Nuclear News reported.
Murmansk Governor Andrey Chibis said the project will create over 5,000 new jobs during the construction phase, and will require hundreds of highly qualified specialists once the units are running.
Source: world-nuclear-news.org (opens in a new tab)1 sourcePermalink