India Returns Tarapur Units 1 and 2 to Grid After Refurbishment
Two boiling water reactors at India's Tarapur station in Maharashtra are generating again after both sat idle since 2020 for a major overhaul, World Nuclear News reported. The pair, first switched on in 1969, formed the country's first commercial nuclear power plant.
India's Atomic Energy Regulatory Board cleared TAPS unit 2 to run again on 7 May, once Nuclear Power Corporation of India Limited finished the refit, according to World Nuclear News. The board set a ten-year window for continued operation.
Unit 1 received its own restart permit last December and is back at its rated 160 MWe output. GE built both reactors under a turnkey deal at an original 200 MWe rating before they were cut to 160 MWe gross.
Engineers swapped out the reactor coolant recirculation piping for forged components in corrosion-resistant stainless steel, the regulator said. The work also brought a containment filtered venting system and an alternate cooling water system into service.
The same site runs two Indian-designed pressurised heavy water reactors, Tarapur 3 and 4, which reached the grid in 2005 and 2006, World Nuclear News reported.
Source: world-nuclear-news.org (opens in a new tab)1 sourcePermalink