Skip to content
voltsdaily

Friday, 4 September 2026

46 briefs so farlast update 22:56 UTC

Key points

  • Holtec Starts Loading Fuel Into Palisades Reactor Vessel in Michigan.
  • Milei Pledges Tougher Sanctions on Companies Drilling Around Falkland Islands.
  • Brazil's Senate Passes Critical Minerals Bill, Sending Rare Earth Rules to Lula.
  • New Mexico Bars New Uranium Leasing on State Lands.

Generation

Holtec Starts Loading Fuel Into Palisades Reactor Vessel in Michigan

Holtec has started loading nuclear fuel into the reactor vessel at the Palisades plant in western Michigan, according to Neutron Bytes, clearing a central step in the effort to return the shut-down station to service.

Neutron Bytes reported that the plant sits on the shore of Lake Michigan. The reactor core is made up of 204 fuel assemblies, a mix of new fuel and partially used fuel from the plant's most recent operating cycles, sized to support 805 MW of electric output, the outlet said.

Fuel load follows more than two years of inspection, maintenance, refurbishment, testing, and equipment upgrades across the station, work Neutron Bytes described as aimed at reliability and resiliency for long-term operation.

The financing behind the restart combines public and contracted revenue. Neutron Bytes cited financial support from the State of Michigan, a loan from the U.S. Department of Energy, and long-term power purchase agreements with Wolverine Power Cooperative and Hoosier Energy. Those offtake contracts give the plant committed buyers for its output rather than exposure to merchant power prices alone.

Source: neutronbytes.com (opens in a new tab)1 sourcePermalink

AI-generated illustration for: Holtec Starts Loading Fuel Into Palisades Reactor Vessel in Michigan
AI-generated image

Generation

Xudabao Control Room Simulator Enters Service for CAP1000 Operator Training

The full-scope control room simulator for units 1 and 2 of the Xudabao nuclear power plant in Liaoning province, China, has entered operation and will train operators for the site's two CAP1000 reactors, World Nuclear News reported.

Both units are to be equipped with 1250 MWe CAP1000 reactors, the Chinese version of the Westinghouse AP1000, according to World Nuclear News.

CNNC put total investment in the two units at more than CNY48 billion (USD6.6 billion).

Ownership of the plant sits with Liaoning Nuclear Power Company Ltd. CNNC holds 70%, Datang International Power Generation Company holds 20%, and State Development and Investment Corporation owns 10%, per World Nuclear News.

Two further reactors are already under construction at the same site. Work on Russian-supplied VVER-1200 units, designated Xudabao 3 and 4, started in July 2021 and May 2022, with commissioning scheduled for 2027 and 2028 respectively, World Nuclear News reported.

Source: world-nuclear-news.org (opens in a new tab)1 sourcePermalink

AI-generated illustration for: Xudabao Control Room Simulator Enters Service for CAP1000 Operator Training
AI-generated image

Generation

Myanmar SMR Site Work Set for 2027 as Rosatom Nears Survey Deal

Ground work on a small modular reactor project in Myanmar is due to begin in 2027, with Rosatom aiming to conclude a contract for the first engineering surveys before the year is out, World Nuclear News reported.

The survey deal stems from an intergovernmental framework that Russia and Myanmar agreed at a state visit in March 2025. That framework covers a 110 MW project built on two small modular reactors, and leaves room to add further units up to 330 MW, according to World Nuclear News.

Each unit is rated at 55 MW. The chosen design is the RITM-200N pressurised water reactor, adapted from the RITM-200 type that powers the nuclear icebreaker fleet.

Source: world-nuclear-news.org (opens in a new tab)1 sourcePermalink

AI-generated illustration for: Myanmar SMR Site Work Set for 2027 as Rosatom Nears Survey Deal
AI-generated image

Generation

New Mexico Bars New Uranium Leasing on State Lands

New Mexico banned new leasing of state lands for uranium mining on Friday, according to Inside Climate News, which described the state as the nation's largest historic producer of uranium ore.

State Land Commissioner Stephanie Garcia Richard signed the executive order at a press conference in Santa Fe. Inside Climate News reported the signing came as the Trump administration seeks to revive American uranium mining and rebuild a domestic supply chain for nuclear fuel.

The reach of the order is narrow. It does not stop uranium mines from moving forward on federal land inside the state, and it leaves active leases untouched. New Mexico has two active uranium leases and no active mines, per Inside Climate News, in a state home to hundreds of abandoned uranium shaft mines.

Two companies are moving toward production regardless. Australian miner Laramide Resources and Colorado-based Energy Fuels aim to begin producing uranium in New Mexico next year, Inside Climate News reported.

Federal policy has pushed the other direction. Last year the Trump administration added uranium to its list of high-priority mining products for national security, according to the same report. The commissioner's order applies only to the state land portfolio she controls, leaving that federal designation and the permitting track that follows it intact.

Source: insideclimatenews.org (opens in a new tab)1 sourcePermalink