OX2 Buys Two 100 MW/400 MWh Battery Projects in Puglia From Hanwha Energy Europe
Swedish developer OX2 has acquired two standalone battery energy storage system (BESS) projects in Italy's Puglia region from Hanwha Energy Europe, each rated at 100 MW/400 MWh, according to ESS News.
Both sites sit in Lecce province in southern Puglia, ESS News reported. Construction is scheduled to start in the second quarter of 2027, with commercial operations expected by the end of 2028.
The purchase adds to a portfolio OX2 has assembled since it entered the Italian market in 2021. ESS News put the developer's Italian pipeline at 1.5 GW, split between roughly 750 MW of solar, 650 MW of standalone battery storage and 100 MW of onshore wind.
Storage therefore accounts for the second-largest slice of that pipeline behind solar, on the figures reported by ESS News. The two Lecce assets carry a four-hour duration at full rated power.
Source: ess-news.com (opens in a new tab)1 sourcePermalink